Author's posts
Aug 29
Office Remodel Underway
Here are some progress photos of the office remodel as construction progressed. Demo starting Starting to chip away the old stucco. Framing of the front gable is started. This feature will match the new construction when the 60 new apartment are built. Interior framing started. You can see the new conference room to the rear. …
Mar 19
Entry Sign
As part of the new trash enclosure we also built a new entry sign on the part of the trash enclosure that faces the street. This is the first permanent sign on the property since the apartments were built back in the early 1960’s. The large arching wings and the sign itself disguise the trash …
Nov 24
Rental Office Remodel
Mesa Court Apartments will be remodeling the rental office building to tie into the new architectural style of the proposed 60 unit apartment complex. The key design element is the front roof gable. The gable mirrors gable accents that can be seen on all of the new buildings in the south complex. The gable design …
Sep 24
Trash Enclosure
The trash enclosure has been completed. As part of the beautification project, Mesa Court apartment has constructed a trash enclosure on the north end of the parking lot. This will remove the unsightly dumpster that has been located at the front of the property. The dumpster will be placed inside the structure and remain out …
Oct 24
Proposed 60 Apartments
Powers Design and Development is working with the Upland Planning Department on developing a 60 unit apartment complex. The new apartments will be built on the vacant parcel of land behind the existing Mesa Court apartments. The new units will be configured with a spacious two car garage on the first floor, a great room …
Recent Comments